Rhyd Ddu Signalling Work

Many thanks to John Savage for sending me photographs of the S&T staff and volunteers at work 13th, 14th and 15th March.

The location cabinets

The token key switches in the ops office and diagram being tested

The S&T works train at Rhyd Ddu

The Down starter signals alight for the first time

The faces of the starter signals on board the works train

The up home signal being measured out

The token key switches assembled

The Down home signal pointing in totally the wrong direction – it was sorted out later

Friday 15th – final testing and signed into use

The up point indicator from the test train

Fitting the new 5mph speed restriction on the Down platform – rather you than me Tim!

Anyone interested in joining the S&T team should contact Tim Prent: tprent@ffwhr.com