NG15 134 Boiler loaded and ready to go
When the boiler was delivered to Dinas, for 130, it made perfect sense to load up NG15 – 134’s boiler on the same wagon!
Loaded and ready to go for treatment to Loughborough.
When the boiler was delivered to Dinas, for 130, it made perfect sense to load up NG15 – 134’s boiler on the same wagon!
Loaded and ready to go for treatment to Loughborough.