Harbour Station Works Progress
Well, work has now started on both inside and outside of the offices
When I emailed Clare to say I wasn’t going to risk driving to Porthmadog this morning, she said, I was right to stay away as, and I quote ” We are under siege from people doing things to doors, all over the place. It’s freezing with doors open and there is disruption everywhere”
Also Aled has been working on clearing all the timber panels
from off the canopy, that originally formed a walkway – alternative fire escape. All this in preparation to give the canopy a power wash.
This front piece looks like a good bit of timber!