Rhyd Ddu Signalling Work
Many thanks to John Savage for sending me photographs of the S&T staff and volunteers at work 13th, 14th and 15th March.
The location cabinets
The token key switches in the ops office and diagram being tested
The S&T works train at Rhyd Ddu
The Down starter signals alight for the first time
The faces of the starter signals on board the works train
The up home signal being measured out
The token key switches assembled
The Down home signal pointing in totally the wrong direction – it was sorted out later
Friday 15th – final testing and signed into use
The up point indicator from the test train
Fitting the new 5mph speed restriction on the Down platform – rather you than me Tim!