Progress on Bertha – Kerr Stuart 4415
Here are some pictures details of the latest progress on Kerr Stuart 4415 from Rob Bishop.
The chassis is ready to receive the gearbox, as picture with the Funkey,
The next target for the project is the installation of the gearbox. The gearbox has been cleaned down, and painted.
We are in the process of making a new steel frame for the gearbox, the steel profiles for this have been delivered, and the other parts have been made at Boston Lodge,
the next job will be to fabricate it. We also have new studs on order for this
job. Also attached is a CAD picture of the design for the frame.