Work in Progress – Carriages
A busy time with 2152, 102 and Ratty 2 in the carriage works

Hard to believe that all of this will fit into Ratty 2,

Meanwhile, Adam, having a change of work from joinery, undercoated Ratty 2’s body

All of this is for 102 – and Norman emailed me to say there is more mouldings to come!

Meanwhile, Ollie was finally satisfied with the fit of the curved shelf at the front of 2152 and the external paintwork is up to undercoat thanks to Steve, our volunteer painter.