Work in Progress – Carriages
A busy time with 2152, 102 and Ratty 2 in the carriage works
![](http://insidemotion.co.uk/wp-content/uploads/2019/06/P1010978-1024x768.jpg)
Hard to believe that all of this will fit into Ratty 2,
![](http://insidemotion.co.uk/wp-content/uploads/2019/06/Ratty-2-1024x768.jpg)
Meanwhile, Adam, having a change of work from joinery, undercoated Ratty 2’s body
![](http://insidemotion.co.uk/wp-content/uploads/2019/06/P1010992-1024x768.jpg)
All of this is for 102 – and Norman emailed me to say there is more mouldings to come!
![](http://insidemotion.co.uk/wp-content/uploads/2019/06/P1010988-1024x768.jpg)
Meanwhile, Ollie was finally satisfied with the fit of the curved shelf at the front of 2152 and the external paintwork is up to undercoat thanks to Steve, our volunteer painter.